paintball6818

paintball6818 t1_j8nqool wrote

The Baldwin bridge didn’t have adequate capacity so it was decided to build new. Q bridge also didn’t have adequate capacity and had giant holes in the footings so rehab wasn’t an option. Goldstar bridge has the capacity so they chose the cheaper option to rehab it.

1