The rest of Copperfield leading up to Brownsville was rebuilt last fall. I think they didn’t go all the way down because they were running out of time due to temperatures dropping (can’t do concrete work when it’s below freezing). I’d call Coghill but also call Tom Joyce who’s the head of construction at DPW and ask. Good luck!
lzurowski t1_jae8s8l wrote
Reply to Can we petition the city to install sidewalks/city stairs at the bottom of Copperfield in Carrick? by Nothing-Mundane
The rest of Copperfield leading up to Brownsville was rebuilt last fall. I think they didn’t go all the way down because they were running out of time due to temperatures dropping (can’t do concrete work when it’s below freezing). I’d call Coghill but also call Tom Joyce who’s the head of construction at DPW and ask. Good luck!