Evaderofdoom t1_j270zgq wrote
Reply to comment by Profession-Life in Safe bicycle infrastructure need not be expensive or pretty - Temporary barriers during Purple Line construction @ UMD/Campus Drive by Profession-Life
You could Google it, it's not locally sourced and is 1300$ per 7 foot section not including labor or installation.
Profession-Life OP t1_j2757jf wrote
Didn't consider that they were prefab. Just was thinking about them being made of concrete, which is often produced local to where it gets used.
Viewing a single comment thread. View all comments