Viewing a single comment thread. View all comments

mansinoodle2 OP t1_jdxsi5r wrote

It was a leak in plumbing that went undetected, so not caused by me.

4

CriticalStrawberry t1_jdxsw2e wrote

Then it sounds like the landlord is trying to take advantage of your ignorance. You are in no way, shape, or form responsible for the repairs on that and likely entitled to compensation from them for the cost of moving, renting somewhere else, and any damage done to your personal property by the water leak. Them telling you to file a claim with your renter's insurance for something that they are likely liable for is a huge red flag.

Call and email DC OTA and find out your rights. They also have emergency resources and procedures for displacement cases like this.

24

mansinoodle2 OP t1_jdxt843 wrote

That is excellent advice. Thank you so much. This is my first time dealing with any of this so I’m totally lost.

6

CriticalStrawberry t1_jdxtyo6 wrote

Best of luck! Landlords often take naive tenants for a ride every chance they get, especially large buildings where they know what they can get away with when tenants don't know any better. It's not your fault. Luckily, DC tenant rights are pretty strong and protective if you know better.

4

mansinoodle2 OP t1_jdxv8ez wrote

I really can’t appreciate you enough, I didn’t even know OTA existed. Thank you

5

NPRjunkieDC t1_jdy7ho2 wrote

I don't see why you need to move out . The leak is in one pipe . Near your bathroom or kitchen.

They should be able to fix this in one day or 3-4 max if they know where the leak is

1

mansinoodle2 OP t1_jdy93kt wrote

The leak has been fixed, it was under the kitchen sink. The issue is that water damage extended to the floors, and since they don’t have the same finish anymore they need to replace all the floors. But I’m not sure why redoing a kitchen island and replacing hardwood floor takes one month.

2

NPRjunkieDC t1_jdy9nyy wrote

Changing the floors takes 3 days approx. Once they get the floors, they can pay for Airbnb or hotel 3-4 days .

They can install the kitchen island while you are there . Takes 1-2 days

2

mansinoodle2 OP t1_jdydb49 wrote

Yeah I’m not sure where the time estimate came from, and I haven’t heard back when I asked for a list of repairs.

2

NPRjunkieDC t1_jdydu4s wrote

They shouldn't inconvenience you more than is needed in terms of time. And they should pay for your trouble.

3

mansinoodle2 OP t1_jdye0l2 wrote

I’m definitely looking forward to my conversation with OTA tomorrow morning!

1