Lil-Wayne-Brady t1_ixr1i99 wrote
Reply to comment by sighbourbon in Electric-vehicle charging stations could use as much power as a small town by 2035 — and the grid isn't ready by Sorin61
From the article, “By 2035, a larger installation serving both passenger cars and trucks could need to provide 19 megawatts of peak power, National Grid projects, roughly what a small town uses. In 2045, that kind of truck stop may require 30 megawatts of capacity, approaching the peak usage of a large industrial plant.”
Viewing a single comment thread. View all comments