keonijared OP t1_iy0dp20 wrote

Yes, you're correct. Dead cabinets/tiles from sub-par data connections or cheap power supplies, merely weeks after completion.

On an installation like this, the design engineer should have accounted for what's called 'redundancy' data connections, so a client (especially like this) never loses a cabinet if something as simple as a CAT5/6 fails.

8

evil_viking t1_iy0ojvd wrote

They use SATA and fiber in signs this big. At least they didn't install this one over a fountain lol

2

keonijared OP t1_iy0pxiw wrote

Yup, familiar with them- especially the signature Daktonics dealer treatment. If you're in the industry too, you know how angry whatever middle management is going to be after getting a call from the top with-

"Someone drove by this and called Johnny to say 'Hey, your new sign is broken'. Fix it."

2