Gogh619 t1_ix93ou7 wrote

Terminal 1, and they’re demolishing A and B once terminal 1 is up and running.

0

VaMoInNj t1_ix9fydu wrote

They changed the name of the new terminal to "New Terminal A" about a year ago. Terminal 1 is no longer a thing.

Also, B is not being demolished, only the old terminal A is. Once that is done, the Port Authority wants to replace the current Terminal B on the foot print of what is now Terminal A. If they do that, they should rename the airport to Elizabeth Liberty Intl since the new A and the new B would be be fully in Elizabeth. Right now Terminal C is the only terminal located fully within Newark.

If and after they do replace B, there was a question about re-doing C on B's footprint, or building a 4th terminal on B's current footprint. PA isn't sure yet.

1

Gogh619 t1_ixbxve9 wrote

Eh, when I worked there right before Covid, they planned on demolishing both. Thanks for the update!

1

toadofsteel t1_ix9czpr wrote

So it's going to be Terminal 1 and Terminal C?

−1