Submitted by Burger-King-Covid t3_10qyorq in newhampshire
SasquatchGroomer t1_j6ttovn wrote
Reply to comment by occasional_cynic in Keene States Memo to students about the cold this weekend by Burger-King-Covid
I'm kind of amazed (and kind of not amazed) that the college didn't retrofit these buildings.
Burger-King-Covid OP t1_j6u4d8t wrote
Owls nests were supposed to be torn down 10 years ago since they are so run down and falling apart so they had no intention of retrofitting them. Carle on the other hand was renovated 4-5 years ago but looks like it’s straight out of the 80s still. If you know what the backrooms are Carle looks like that inside. Carle keeps getting flooded by sprinkler systems and ruining hallways after hallways and peoples rooms. I have no idea why Carle still has electric heat.
pixieanddixie t1_j6uwonc wrote
Just curious… did they kept the waffle ceilings?
Burger-King-Covid OP t1_j6uxiu5 wrote
Waffle ceilings are still there and have never been better.
pixieanddixie t1_j6uya6e wrote
Some of the best times I don’t remember happened in 2C
Carle is legendary. Thank you for the trip down memory lane.
occasional_cynic t1_j6uyd83 wrote
I am guessing then that those dorms will be ripped down soon. KSC built a ton of new ones on the South side of campus, and enrollment has plummeted.
Burger-King-Covid OP t1_j6uyl2z wrote
They are tearing down monadnock and Randall so owls nests and Carle hall are now needed. Any spare doubles that are not filled get converted into super singles and you get 2 of everything and a king size bed.
occasional_cynic t1_j6uzda3 wrote
So, what is going where Monadnock and Randall are then? Or are they selling the land?
Burger-King-Covid OP t1_j6uzv1b wrote
Some other college bought it and is building their campus there
Viewing a single comment thread. View all comments