Submitted by imaluckyduckie t3_11milsc in jerseycity
LateralEntry t1_jbi1cn2 wrote
RIP peace and quiet of Vyv residents for the next few months
drkensaccount t1_jbi4k35 wrote
Not just them, We'll be hearing this from Newport to Harborside. But don't worry, there's only 4 more towers to go after this one. And then the 6th Street Pier Buildings, the Avalon tower, the parking lot in front of The Lively, The Evertrust parking lot, the rest of Urby, The tower going up where they have Smorgasburg, and the old 111 1st street site. But, once those are built, you probably won't hear any piledrivers. Unless the city builds that park over the river Soloman's been talking about. Then that should be it.
leboeufie t1_jbk8g5a wrote
Wait, I thought in total there are supposed to be 12 towers so 10 more to go, 9 after this one is done. Did the plans change?
drkensaccount t1_jbklkdo wrote
Good point, I was considering the remaining 4 blocks each individual towers, but some inevitably will be double towers (the one currently being built is one tower). Since double towers are usually built sequentially, it'll one after the other so it definitely counts as 2 separate buildings. To be more accurate, it'll be 4 to 8 more towers in TSCFKAMP, plus everything else. Also, I forgot there's one more tower to be built on Marin, next to the (not Jared) Kushner building, so add that to the list. But once all those are built, we won't have to deal with piledrivers. I for one look forward to this time of peace and tranquility.
ffejie t1_jbn76nt wrote
2055 is going to be amazing.
NaedDrawoh t1_jbi2l1m wrote
Those fuckers are BRUTAL. Construction can be like 3 blocks away and they're still driving you mad.