Submitted by TravelTime_LKB t3_123rl5v in dataisbeautiful
casus_bibi t1_jdwf5n1 wrote
Reply to comment by lotosprendidos in Compare Public Transport Network Connectivity In 10 European Countries [OC] by TravelTime_LKB
It isn't really cheap to build on swampy soil either. It requires months for soil/sand to set, digging requires constant pumping and anything build up requires piling to be stable. One tunnel in the Netherlands was postponed over 5 years because it kept filling with water, for example. The geography matters, but it is far more complex than orography alone.
Viewing a single comment thread. View all comments