You definitely do not want to run the things at full speed right off the bat and not let the sleepers and ballast settle.
Much like a car or outboard engine there is a break-in period to some things - this includes subways and light rail. Failure to let settlement happen could result in derailment and damage to the track.
What a fucking disgrace. Tracks in disrepair since 2019, and nothing was done about it. They could’ve used the lockdown to properly repair everything but no, the MBTA is gonna MBTA and just fuck everything up.
vhalros t1_irfz7f6 wrote
I'm not disappointed that you didn't fix it, MBTA, I'm disappointed that you lied.