Comments

You must log in or register to comment.

M_G_3000 t1_iu0jn12 wrote

It never ends. It's just brief pauses between more road work.

51

spiked_macaroon t1_iu135tp wrote

Idk but the split between 190 and Burncoat heading north is terrible. They should do one lane left, and one lane right, not one lane going both ways and another one squeezing into it. KnowwhatImean?

13

Plenty-Concert5742 t1_iu16aao wrote

How about Salisbury St? Horrible traffic, especially in the afternoon. Hope it doesn’t go on much longer.

6

dpceee t1_iu1bjpf wrote

Roadwork never ends

12

snakeman1961 t1_iu25cpk wrote

"Don't kill the job"" is the Mass highway contractors' motto.

2

-hesh- t1_iu289du wrote

it's cute you think it will end at all

2

ShockyWocky t1_iu2c134 wrote

It's been like this at least as long as I've been driving (10 years). I feel like it just shifts to a slightly different spot over there every 6 months or so.

1

NovelNo87 t1_iu2tx3a wrote

When the Sun is darkened and the moon gives no light, and the stars fall from the sky.

4

slum_life_frownface t1_iu3ylzg wrote

It literally never ends, they patch a hole then come back the next year for another.

3

albalfa t1_iu7dswk wrote

I think others have given OP the answer.

But seriously, without hyperbole (and I should say, also without a shred of actual evidence), it seems to me that between the start of 190 at the Rt. 2 split in Leominster and the end of 290 at 395 in Auburn, I cannot think of a time since the 90's when there hasn't been construction somewhere along that route.

I'm sure someone can prove me wrong factually. It just feels that way trying to think back.

If you include the section of 290 from the 190 split out to 495, then fuck it. I have to be right. Right?

3