DiegoForAllNeighbors t1_ivuyp14 wrote

This was one of the biggest things that came up in the campaign for City Council. Makes life impossible for a bunch of high schoolers who have like a 30 minute detour to walk around… they bear the brunt of poor design choices… not chill

4

overthehillhat t1_ivv6kw4 wrote

Same time consuming process as the Park Ave RR bridge

1

techsavior t1_ivxq79h wrote

Any time a span over a railroad bed is worked on, a rail worker has to be on site as a safety supervisor to ensure the integrity of the rail corridor.

Amtrak has been unable at times to schedule a worker to supervise, and that is causing delays. It’s not the state’s fault this time.