Submitted by dissolutewastrel t3_11mxvu2 in Pennsylvania
No-Setting9690 t1_jbkvpx1 wrote
Reply to comment by mattcrwi in Will the cost of a central Pa. thruway reach $1B? PennDOT officials hope not by dissolutewastrel
2027 baby. The current plan is from penn st bridge to mt penn. Widen all highways, change bridges to modern butterfly ramps, fix i176 onto 422 merges. Can't wait.
It's the northbound on 222 that sucks ass. They haven't even paved it in decades. From interchange at 73, all the way to kutztown, it needs to at least be widened to 2 lanes. WTF do we still have a single lane part on 222 connecting Reading and Allentown.
Edit: Hit enter early
mattcrwi t1_jblnpgn wrote
I thought they cancelled that project but I guess they just postponed it around covid. That's good to hear. We'll have some safer roads in my lifetime lol
Viewing a single comment thread. View all comments