That's awesome. We would have had over 2MWh if I had correctly interpreted CMPs Energy Meter. It was showing we only used about 600 kWh in both July in August when we had ACs running 24/7 and the pool pump running constantly. It didn't occur to me that CMP wasn't metering the generated power that I was consuming which meant I consumed much more than 600 kWh those months. We put the pool pump on a timer and scheduled the ACs after that :)