portnux t1_j2eimb0 wrote
Reply to comment by AltitudeTime in Had a plumbing issue upstairs, now i need to replace a ceiling drywall cutout used to access the plumbing from below. My progress is below, and im now nervous about the consequences of adding the joint compound without an actual joist or wood anchor behind it. Is this patch temporary or should i be by jrab3717
Actually, I meant gluin and screwing 3ā wide lengths of drywall on top of the existing drywall (patch removed first) on all four sides so he could attach the patch to them. Iād also suggest he cut away the paper around the patch a couple inches for the new paper to lay flush.
AltitudeTime t1_j2ekpcl wrote
Your suggestion works, but it depends on if the cutout was flush with the framing because there wouldn't be room for the drywall overlap on to the existing drywall for at least part of the patch if it was because the wood would be in the way.
Viewing a single comment thread. View all comments