Submitted by ExtremeCauliflower76 t3_z4iy4a in DIY
Jpalin6 t1_ixr3x1y wrote
Yes, it can be done. Years ago, we had our front concrete walkway leveled to address water flow also. They used a massive crow bar to lift the slabs, regraded the ground, added filler and replaced the concrete slabs. Not sure if this works with severely cracked slabs. Good Luck!
Mesoposty t1_ixrcuub wrote
They can also drill holes in the slab and pump grout under it too lift it. It can work very well
ExtremeCauliflower76 OP t1_ixr570q wrote
Thanks!
Viewing a single comment thread. View all comments