Submitted by marshgirl12 t3_z8dr2w in DIY
bassboat1 t1_iydjla9 wrote
Reply to comment by marshgirl12 in where to end uncoupling membrane on floor in relation to drywall? by marshgirl12
Control joints are cast-in-place (look down the next time you're on a sidewalk), or sawn after the concrete has hardened (often on a 10' or 12' grid). It's expected that a concrete slab will shrink as it cures and inevitably crack. The control joints will (hopefully) limit the cracking to the grid and not occur randomly, at angles, etc... Fiber additive or welded wire mesh is embedded in the concrete to help prevent the now separated pieces from moving vertically with respect to each other. The uncoupling membrane prevents the cracks from telegraphing through bonded materials like tile. On large slabs, expansion joints are required, and they should be continued up through the tile as a caulk joint.
Do not run Ditra or the fleece products like Redgard/Custom up the wall. Kerdi can be run up the wall in some shower systems.