RL203 t1_jbiyfdn wrote

Meters are definitely tagged in Toronto, at least where I live, which is high park. In order to remove the meter head, there is a clamp around the circumference of the base of the meter that is loosened via a bolt. The tag runs through the bolt to prevent it from being tampered with. You can't remove the meter without cutting the tag.

I'm 100 percent sure of this.

Everything I've described, I've done myself.

And I'm currently in the process of a full rewire of my current house. The process for that is the same. Phone ESA, pull a permit. They will inspect at the rough in stage and the final stage.

You get 2 inspections at the rough in stage, if you fail the second inspection, you need to pay again.