sweaterandsomenikes t1_j8ntut7 wrote

I work on it. First phase is all structural steel repair, under the bridge. AKA the only evidence of work from above is the lane closure to reduce live load on repair nodes. Three year contract that started in spring 2022. 2nd and 3rd phases saw the engineer get fired so another design needs to come out. I expect at least a year delay from that. Hopefully phases 2 and 3 (they are combined) go out to bid for construction to begin in 2026.